17,979 MW
DEWA installed generation capacity, up 4.66%.
Electrical engineering in the UAE,
and how AI is changing it.
Electrical engineering is the field that studies, designs and applies technologies that use electricity.
The UAE National AI Strategy 2031 aims for the UAE to be a global leader in artificial intelligence by 2031.
17,979 MW
DEWA installed generation capacity, up 4.66%.
40 TWh
a year from the Barakah Nuclear Energy Plant.
30-50%
AI-based fault detection can make grid outages shorter.
Data centre electricity demand will roughly double.
485 TWh
2025
950 TWh
2030